Waste Minimization (SB14) Programs

Every 4 years, qualifying facilities must prepare a new minimization plan and submit the Summary Progress Report (SPR).

Qualifying facilities include those that generated more than 13.2 tons of hazardous waste in 2010.  Wastes that are considered are both RCRA and non-RCRA waste, and are generated on site (even if the generated waste is then treated and/or not manifested).  A common mistake is to not include hazardous waste water that is treated on site and discharged to the sewer, as this waste water does qualify as hazardous waste generated.

For more information go to http://www.cdms.com/our-services/hazardous-material-regulatory-support/reporting-plans/waste-minimization-plans/

If you need assistance determining if you are required to address Waste Minimization requirements, or to learn how CDMS can address the requirements for you, please contact one of our offices.




Comments are closed.